• Visitors can check out the Forum FAQ by clicking this link. You have to register before you can post: click the REGISTER link above to proceed. To start viewing messages, select the forum that you want to visit from the selection below. View our Forum Privacy Policy.
  • Want to receive the latest contracting news and advice straight to your inbox? Sign up to the ContractorUK newsletter here. Every sign up will also be entered into a draw to WIN £100 Amazon vouchers!

New Contractor Joins Team - Strictly 9->6

Collapse
X
  •  
  • Filter
  • Time
  • Show
Clear All
new posts

    New Contractor Joins Team - Strictly 9->6

    Ok so I come from a perm background and am just doing my first gig - I am earning 2 times what I got as a perm (and that without the tax advantages)

    The team is generally young recent grads so a lot of these guys work hard and long hours

    Generally I work from 8 -> 7

    Well a new guy has joined who is a more senior contractor and he is strictly 9->6PM

    What sort of times do people do in contracting here??

    #2
    Strictly 9 -> 6 on a normal day with 1 hour lunch. I will work longer but my rate goes up after my "core hours".

    Currently lucky in that client co. permies only do 9 -> 5 so I do as well, which, with a daily rate rather than hourly works out really well.
    Last edited by Cowboy Bob; 22 November 2009, 12:05.
    Listen to my last album on Spotify

    Comment


      #3
      9:30 to just after 6, with a 45 min lunch and a couple of fag breaks.

      Working long "permie" hours is bad for productivity in the long run, as people start getting sloppy and spinning things out, especially in the morning.

      Expecting long hours as a matter of course is a sure sign of a bad manager, unless there's a specific reason such as a temporary flap or a need to interact with people in different time zones to complete some task.
      Work in the public sector? Read the IR35 FAQ here

      Comment


        #4
        9 to 5. Always. 8 to 7 is ridiculous IMO. I presume you don't have kids. As a contractor you don't need to have the permie attitude of being seen. I will only be judged on performance and deliverables.

        Comment


          #5
          8.30 - 4.30 with 1 hour for lunch

          If you want to work late or long hours then go permie
          "Ask not what you can do for your country. Ask what's for lunch." - Orson Welles

          Norrahe's blog

          Comment


            #6
            12:00-13:00 with 59 minutes for lunch As a contractor I set my own times.
            Brexit is having a wee in the middle of the room at a house party because nobody is talking to you, and then complaining about the smell.

            Comment


              #7
              8.30 - 5.30 with an hour for lunch.

              I'll work longer hours for a build up to go-live or a particular part of the project, but would never let the client think that I'd work that as a norm.

              You can burn-out too easily and the client will always let you do it.

              In fact I make a point of working 8.30 - 5.00 for the 1st 2 weeks of the contract. That's when the 'norm' is set....
              "I can put any old tat in my sig, put quotes around it and attribute to someone of whom I've heard, to make it sound true."
              - Voltaire/Benjamin Franklin/Anne Frank...

              Comment


                #8
                9:10 to 4:30 with a half hour break.

                They signed me up knowing I have a 3:30 hour commute and that I am very good at my job.

                Comment


                  #9
                  I work for as long as I'm contracted to, plus anything extra I think I need to do to get the job done, within the bounds of commitments outside of work.

                  Thats recently meant 8.30ish-6ish with a few late nights and/or early mornings if the project needs it, provided the client is equally flexible in terms of time in lieu and/or overtime rate. Once you've shown a certain level of commitment and professionalism in your work, I find clients are flexible and accommodating, it works both ways.

                  If I'm learning something new I'll put in extra time because it benefits you+yourco in the long run, and the client shouldn't be paying for your training time.

                  Comment


                    #10
                    I'm a start early, finish early kind of monkey. I can usually do the hours I want and have a very short lunch break.
                    +50 Xeno Geek Points
                    Come back Toolpusher, scotspine, Voodooflux. Pogle
                    As for the rest of you - DILLIGAF

                    Purveyor of fine quality smut since 2005

                    CUK Olympic University Challenge Champions 2010/2012

                    Comment

                    Working...
                    X