And the electricity man
And the water man.
They are digging the whole street up.
The drilling started at 7:34 precisely.
By 7:45 they were ringing the doorbell.
Electricity, water, gas all being disconnected then reconnected to temporary supplies 2 meters up in the air.
Hopefully without too many loud bangs.
Then the street comes up.
Oh what fun.
And the water man.
They are digging the whole street up.
The drilling started at 7:34 precisely.
By 7:45 they were ringing the doorbell.
Electricity, water, gas all being disconnected then reconnected to temporary supplies 2 meters up in the air.
Hopefully without too many loud bangs.
Then the street comes up.
Oh what fun.
Comment